Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 亚洲AV香蕉一区二区在线观看 | 亚洲中文字幕在线观看视频 | 欧美成人午夜福利 | 8x8Ⅹ8X拨牐拨牐8免费播放器 | 久久久久亚洲国产AV无码 | 国产黄色免费网站 | 欧美成人午夜无码A片秀色直播 | 熟女丝袜av一区二区 | 影音先锋在线观看资源站 | 免费在线观看黄片 | 懂色av蜜臀av色欲av蜜乳 | 精品人妻一区二区三区蜜桃 | 成人网站免费观看完整版入口 | 试看120秒一区二区三区 | 久操视频在线观看 | 精品人妻伦一二三区久久春菊 | 欧美老熟妇又粗又大 | 国产精品久久久久久AV中晋 | 成人网站免费观看完整版入口 | 国产 日韩 欧美 中文字幕 | 丰满岳乱妇道伦91麻豆 | 国产成人三级一区二区在线观看一 | 北条麻纪码免费版官方 | 3D动漫精品一区二区三区 | 波多野结衣av一区二区蜜桃观看 | 一级a做一级a做片性视频爱小说 | 国产偷人妻精品19p 中国少妇自慰成人A片 | 强行糟蹋人妻中文字幕 | 欧美综合一区二区三区 | 亚洲国产精品无码久久久久久久久久久 | 安徽妇搡BBBB搡BBBB小说 | 免费黄色视频网站 | 无码精品在线观看 | 国产精品一区二区久久久久久久久久 | 狂揉小泬少妇精品无码 | 西西4444WWW无码精品 | 无码精品久久一区二区三区四区 | 少妇搡BBBB搡BBB搡抖音 | 蜜桃色永久入口播放软件 | 国产三级片在线观看 |